UNIVERSITY OF WASHINGTON STADIUM

Starting May 3rd, Coast to Coast Turf is renovating University of Washington's Stadium. This is the process that we will take to revamp this stadium.

  1. The Tear Off

    • We will mark out the field at 7.5 foot widths​

    • We start cutting the field with a walk behind turf cutter

    • While the field is being cut we have a bobcat with an attachment that rolls the turf up in perfect rolls.

    • Forklifts begin picking up the rolls and taking them to the parking lot to be loaded on trucks. 

    • The original base is exposed.​​

  2. ​Base Work​

    • Our base team begins to regrade the base.​

    • Hundreds of tons of gravel is brought in.

    • We begin to shape the base for the new field.

    • The base is rolled and flattened to perfect grade.

  3. ​Turf​

    • Now that we have a perfect E-layer we begin to layout the field with paint and string-lines​

    • The Turf is now rolled out.

    • Inlays are cut in

    • Logos cut in 

  4. ​Infill Drop​

    • Now that the field is turfed, we begin to drop infill.​

    • Sand is dropped first, followed by rubber. 

    • As infill is being dropped, a sweeper follows, ensuring that all the fibers stand up.

THE TEAR OFF BEGINS

May 3rd, 2021

IMG_6673_edited.jpg

TEARING OFF THE EXISTING TURF

This is your Project description. Click on "Edit Text" or double click on the text box to start.

IMG_8439_edited_edited.jpg

TEAR OFF COMPLETE

This is your Project description. Provide a brief summary to help visitors understand the context and background of your work. Click on "Edit Text" or double click on the text box to start.

IMG_7074.PNG

THE NEW TURF 

This is your Project description. Provide a brief summary to help visitors understand the context and background of your work. Click on "Edit Text" or double click on the text box to start.

IMG_7115.PNG
bottom of page